Hello!
I am planning a system with several Skylla i. 2 of which the service batteries should charge (Lynx bms, 200A lifepo4 victron batteries) and one the start batteries. planned is a cerbo. I would like to integrate all skyllas per ve can into the system. not all skyllas will always have electricity, through different shore power inputs. in addition, 2 victron quattro 24/5000 should be installed in parallel operation. how do I best address the system in the ve can?