Background - in good days with enough PV yield the battery is full at midday. Then the MPPT is throttled. We want to load the battery slower over the whole day and use the sureplus power for heating water or grid feed in.
How can achieve this- normaly i think with DVCC - but the GX manual 11.4.6 says that this wouldn't be appylied to MPPTs.
I tried it with nodered