Hey Folks
I have a grid-tied, 3 phase PV system that exports excess power to the grid for a pittance.
I also have a separate Victron ESS system (comprising an MPII, Cerbo, MPPT 250/100 with separate 6 kW of PV). I’m hoping to make this system a little smarter by using the excess solar from the grid-tied system to charge the battery on my Victron system.
My ESS is currently set to ignore AC input until battery drops to 10% or if loads are high and I need to keep this feature on, but then I want to also force a charge when there is power being exported to the grid from the other grid-tied system (& at a rate equal to whatever the export is).
I’m thinking I need to use the VM-3P75CT to monitor export on Phase L1 (the one connected to my ESS), but I’m not sure how to program the system to force the charge at the rate equal to the exported power? Has anyone got any experience with this or any ideas? Not sure if it’s possible on ve.config or whether it’s a Node Red job??
Hope it all makes sense. Schematic below to help with my explanation.
Cheers