Hello All,
I have an installation with two systems:
The first system has:
1 x Multiplus 24/5000/120 Inverter
2 x SmartSolar MPPT 150/100 - Tr VE.CAN Charge controller
12 x Winner 8 OPzV 800 Batteries
The second system has:
1 x Multiplus 24/5000/120 Inverter
2 x BlueSolar MPPT 150/100 - Tr VE.CAN Charge controller
12 x Sunlight 7 SOPzV 990 Batteries
Both systems were installed in the same space but at different points in time.
I imagine that I cannot connect the charge controllers since the batteries (and charge controllers) are different.
Can I connect the two inverters as Master and Slave so I can connect AC input?
If not, can I connect the same AC input (one line that will be connected in parallel to the Input) and also the same AC output (again in parallel so that I can power the same switchboard)?
The target is to be able to charge the batteries from AC and also to power the same switchboard with both inverters.
Any other suggestions would be welcome.
Thank you in advance.