I use 2 Multiplus II 3000 at an island system. When running each single Multiplus II at default settings the idle consumption is close to the 11w of the spec. After I connected them in parallel and configured the master as Self-consumption Hub without feedback the idle consumption increased to unacceptable 90w total.
I guess connecting the Multiplus in sequence could solve this problem - the fist Multiplus acts as input for the second Multiplus.
The second Multiplus would run best with some kind of load balancing config like
- limit input current or inverter to 5A if load <10A
- limit input current or inverter to 10A if load <20A
...
How can this be done?
Does this design have disadvantages I don't see?