I have a client that already has an ATS system from his generator wire direct to his consumption board, and now wants to add Multiplus 2 connected with batteries, My question is, is this going to affect the switch over of the inverter when the power discounts and how do I solve it, must I remove the ATS from the board and connect directly to the Multiplus 2 or ask the client to upgrade to the Quattro.