Hi,
My batterybank prefers 40A charging current to maximise the cells life span.
My MPPT can put out 100A.
The remaining 60A could be used to compensate for active changing DC loads. The battery's have smart shunt connected to measure the current.
Therefoàre I am thinking about modulating the maximum charge current from Node-Red or search for a solution in the Gerbo environment.
I am worried however that the parameter is stored in EEPROM and that type of memory has limited write-cycles.
Anyone know the internals of a 150/100 MPPT? Are my worries valid?