Force MPPT to DC grid feed-in

Hi!
is there a way to force the MP2 to feed in to grid, before DC charging battery?


feed-in
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

3 Answers
matt1309 avatar image
matt1309 answered ·

With node red/adjusting grid setpoint yes.

Otherwise i'm not aware of a way of enabling this. (if you find out let me know).

I can share node red code for this if helpful.


2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

nickdb avatar image
nickdb answered ·

You can just set the setpoint to be negative in the ESS menu on the GX directly.

If you want to schedule this then you would need to use node-red or MQTT to push the value required at the time required.

2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

guru77 avatar image
guru77 answered ·

perfect. thank you!