I’m having issues setting up my ET112 into my ESS system, consisting of a Multiplus II GX with 2 x US5000 and 3 x MPPTs.
When I have my MCB open disconnecting the Inverter to the grid and distribution board the ET112 looks like it is reading fine. However as soon as I connect my inverter, the readings go completely wrong and I can hear the inverter ramping up and down and not staying steady. The load is staying constant.
I feel like I have the settings wrong for this so some help would be appreciated. Photos of the single line diagram and GX screen showing the ET112 reading correctly while inverter disconnected shown below: