Hi all,
I have a lot of scripts on Cerb GX in a narrow timeframe steering the battery load and the gui/dashboard.
If I want to open node red, it gets quite often unresponsive as soon as I want to display the global flow-paramerters. Is there an option to outsorce the main load ti a parallel node red on a raspberry pi to steer the cerbo?
Background: I am coordinating a maximum net feed of 4 kWh with a battery of 30 kWh and an hourly e-provider and try to optimise this for a solar power of 9 kW peak and based on forecast and empirical load data.