Hello I recently installed bmv twon an existing off grid Solar System period
I set up the system with a midpoint moderating system period when the BMV went online.
The midpoint battery alarmed at 50% disparity. The midpoint attachments are to the positive on battery bank one. And to thepositive on battery bank two of the same twenty four volt system.
My question is whether the wiring is correct.It was unclear based on based on the diagram with the instructions.
If it is incorrect where does the second monitor need to be attached?
Just for clarity, there are 4 , 6v batteries in each bank that are connected through jumpers at each end of the battery bank, with 2 leads 1 negative 1, positive going to the positive and negative bus bars.