question

ed-rettikketet avatar image
ed-rettikketet asked

Node-RED dashboard "Connection lost"

Hello,

For some reason I can't access the dashboard that shows the ESS schedule.

Is somebody familiar with this error message?
dynamic-ess-connection-lost.jpg

ESSdashboard
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

1 Answer
nickdb avatar image
nickdb answered ·

Hi @Ed_rettikketet

A lot has changed with DESS.

But for beta software, please have a read of the dedicated beta topic for DESS.

Known issues are discussed there, and if you find a new one, please post it in that topic and rather don't open new questions on Q&A or modifications.

That way the dev teams can see what is going on.

Thanks.

Here is the link https://community.victronenergy.com/articles/266992/dynamic-ess-on-beta-vrm-part-5.html

There is also parts 1-4, which have history and show how to set it up. It requires running the beta venus OS and that it is on the latest version.

2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

Related Resources

What is ESS training video

ESS Quick Installation Guide

ESS design and installation manual

Additional resources still need to be added for this topic