Hi All,
i have a Victron ESS consisting of
- Cerbo GX
- Multiplus 48/3000
- EM530 for Grid Measurement
- ET340 for measuring the PV Generator(s)
- A DIY LiFEPo Battery with JKBMS (SerialBattery on Cerbo)
- one 3 Phase SMA PV Inverter (8kW)
- one 1 Phase Growatt Inverter (3kW)
The System is running in Germany.
I want to add two further PV Inverters. One will definetly be a 2kW single Phase Inverter, the other one will be something in the Range of 5-6KW, so most probably a 3 Phase one. But all will be monitored with the ET340.
So my question is regarding the two single phase inverters:
Can I operate them on any phase, or do i need to have them all one "Phase 1"?
In Germany, there is an Unbalanced load limit of ~4kW, so i would like to rather have the Multiplus on Phase 1 and the two single Phase Inverters on Phase 2 and 3.
Will that work, or will it confuse Cerbos internal algorithms?
Thanks in advance