Dear community,
I am drafting a victron system for an aluminum vessel with the following power in:
- Shore
- Wind Turbine
- Solar panel
- Alternators
My plan is to take all the DC power (whichever source is available and could be simultaneously) into a bus bar (Lynx power in) and this power to a Lynx distributor with 4 loads which goes to 4 independent DC chargers to 4 different batteries/battery bank (need to be separated as there is not enough space for a single power bank and because of weight balance of the vessel), also each battery will power specific intruments/equipments.
There are manual on/off switches in every DC charger to prioritize manually which battery to charge first, example: switch off 1 charger to prioritize the other 3.
Manual on/off switches on every battery output if i choose not to invert from an specific battery to the AC distribution box.
Switch selectors on each of the DC distribution box in case i want to power it from another battery
Draft as below:
My question are:
1) Does this system makes sense? Would this work?
2) If it works, using only one CerboGX will as a communication center will be enough? else which communication center should I use?