Screenshot_2024-02-17-12-29-10-906_nl.victronenergy.jpgI have 15kwh BSL Lithium Battery (Slim Line) installed with 5kva 48V Multiplus I and Victron Smart MPPT 250/100 Tr using a Cerbo GX. I noticed the Inverter doesn't charge the battery when Grid is available, it will only do 'Passthrough", the MPPT only charges the battery during the day when Grid supply fails but will stop charging immediately Grid is restored. Please what is the solution to this.