Hi,
I have recently set up two MultiPlus II 3000VA units in parallel to cover for periods of high load. I am wondering if it is supported to wire remote on/off of the slave unit to a relay and use assistants on the master unit to enable/disable slave based on the load.
Since both run in sync would it trigger alarms / problems when slave unit is off? I would then put assistant to start the slave on load going above 2000W.
Idle consumption of 3000VA is not very high +/-19W so I am not going to die over this, just curious if supported.