I have a setup with three Quattro inverters configured for a 3-phase system at home. The power input comes from an ATS that alternates between grid power and a generator, both supplied in 3-phase. I've noticed that when the ATS switches to being powered by the Gen, the inverters fail to synchronize. I've verified the output of the Gen, and it seems appropriate at 230V/50.4 Hz. However, synchronization occurs when I adjust the ESS settings to "Keep the battery charged". This presents a challenge, as the Gen, which is set to automatically start when the battery level drops to 35%, won't synchronize without manually tweaking the ESS settings.
Does anyone have suggestions on how to address this issue?