Hello,
The installation consists of 2 Quattro 5kVA units in a split-phase configuration, 4 PYLONTECH Lithium batteries (5kw.h each), 1 Charge controller 450V & 100A, and a Cerbo GX.
My problem is as follows: during a power outage from the utility provider, the switch seems to take too long. It is imperceptible to the naked eye, but the computers reboot. When the breaker (AC IN) is lowered, the computers do not reboot.
Do you have any idea about the origin of the problem and how to solve it?
Thanks in advance