Hello everyone,
according to German law, I have to limit the feed-in power in various stages. I get a device from the energy supplier that throttles the feed-in power via 4 relays in the following steps 100% 60% 30% 0%. The relays are then controlled by the energy supplier.
Is it possible to connect the outputs of the 4 relays to the 4 digital inputs of the Cerbo GX and then set the "limit feed in power" via Node Red?
Do you have any other ideas on how I can implement this as simply as possible?
Thank you!
Best,
baba