I am interested in a solution for managing a single-phase domestic system (already functioning and equipped with a 10kW photovoltaic system with storage and blackout management) which must be connected to a three-phase distribution network.
It must also be possible to feed energy into the grid in the event of excess photovoltaic production.
Can a Victron solution be used for this purpose?
Thank you