Smart Shunt chassis loads

I'm installing a new Victron system, 2x lfp batteries, 24/12 dc-dc charger, a 12/30 mppt solar controller, and a ip65 Smart Shunt. My query is, is ok to use different chassis earth/return points along the chassis for all load and chargers or, should they all have a common 'tie' point on the chassis to the load side of the shunt? .....cheers Mike

smart solar set-up help
2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

2 Answers
regman54 avatar image
regman54 answered ·

A common ground (tie point or buss bar) would be the best practice.

2 |3000

Up to 8 attachments (including images) can be used with a maximum of 190.8 MiB each and 286.6 MiB total.

Mike Gillming avatar image
Mike Gillming answered ·

regman54, thanks mate, yeah I sort of thought as much, so I'll run, in addition to chassis earth, a separate 10mm cable from the shunt load side back to a common tie point about a metre away...thanks mate!