We have a 3-phase installation comprising:
9x 15kVA Victron Quattro
9x RS450 Victron MPPT
3x 20kVA Fronius Symo
314kWh Solar-MD battery
When the grid fails, we often experience voltage swells for between 20 and 90ms on the output. The highest so far (measured with a Fluke 434) was around 277V!!!
The above is only observed when the Fronius Symo units are in production.
We have followed the relevant guidelines for Fronius integration and double-checked the settings several times.
Any suggestions will be appreciated.