I've got 2 MP2 12/3000 units and I want to run them in parallel in a caravan, but I won't always need the full 6K of power. Is it possible to only run 1 inverter if I'm running small loads like 1 cooktop and then I can turn the slave unit on if I want to run more appliances?
Is there any settings I need to look out for in general when setting up the units for parallel operation
Thanks