Hi, I have a design for this system in the picture. I want to add another system to my existing 3-phase ESS system with AC coupled Fronius on AC-OUT, which is 1-phase and would be connected via ET112 to the AC-IN side. In CerboGX this ET112 will be set up as a PV inverter. But what if there will be consumption behind this meter? Is the system ready for bi-directional power flow for such a connected AC coupling inverter? Will the Multiplus-II charge the batteries from the excess energy from this side and in turn - will the Multiplus cover the consumption behind the ET112 from battery?