I am already using relay on Cerbo GX to controls start/stop diesel generator (using SoC).
Now customer want to add wind generator TEG-1000-WDL to the system. How I can automatic disconnect wind generator to prevent battery overcharging? And connect again when SoC would be lover than 95% (for example) ?