Hello all,
I am considering system as below,
- 3 phase 230/400V grid
- 1 MultiPlus on phase _1 + dedicated (separate) battery
- 1 Quattro on phase _2 + dedicated (separate) battery
- 1 phase 230 V generator connected to the Quattro in 2nd input
I'm fully aware that I can't make: split phase, parallel or 2-phase sync system with that.
I think above configuration will work - correct me if I'm wrong. Of course in case of grid failure there will not be 3 phase power (or even 2 phase synced, just 2 separate 230 VAC).
What I don't know is it possible to connect and control it from one CCGX (or Venus or other system)?
What if we add DC Solar (Victron MPPT) and AC coupled 3-phase solar inverter (on the loads side)?
Again - in case of grid failure the 3 phase AC solar goes down (that's obvious), but we can still operate on 1 phase (phase of Multi/Quattro with MPPT connected).
Is two separate Multi/Quattro will be visible on CCGX/Venus/etc?
Regards
Hubert