Hello!
I’m running a threephase off grid setup with multi 15000, BYD lvs (6 towers x 4 modules), parallel 95mm2 about two meters length to lynx, and about 4 meters of 70mm2 from lynx to the batteries.
When I test run the system under load (~30kw) and I disconnect the “generator” (actually the grid now as we’re still in commissioning) I find the transfer time unusually long. It’s barely noticeable, but it makes an air conditioning unit we’ve got connected restart for example.
I haven’t had any issues with the UPS function on multi 3000/5000 when jumping from grid to inverter (routers, PC:s etc not restarting)
Is this considered normal when the system is under load?
The load will run primarily on PV on ac out when in use, but I’m not happy about it cutting out when the generator stops.
Thank you!