Hi, I am using 3x Victron Multiplus II 48/5000 with Cerbo GX.I am programming the system in Node-Red. I control the supply to the boiler according to the time of day, excess electricity production and SoC. Boiler power is 1.33 kW for each phase, I use only one phase.
It is possible to buy a simple SSR relay?
I would like to use Node-Red to reduce the supply to the boiler, easily in steps of 0/10/20..90/100%.
Thanks.