Having read this adjacent post together with the wiring unlimited PDF, could anyone please check my understanding and intentions:
Scenario:
4 x 12 V 200 Ah batteries wired in parallel connected to Multiplus 12/1600/70
Battery to busbar cable lengths are 50 cm
Busbar to inverter cable length is 100 cm
My intentions:
• Ignoring surges, inverter will place a maximum load of 133 A (1600 / 12) on the DC input
• Consequently, I will need a 200 A fuse between inverter and battery bank 133 x 1.25
• Battery cables to busbar: 16mm2 ( 4 x max current 48 A)
• Busbar to inverter cable: 50mm2 ( 1 x max current 150 A)
Have I got that right?