Hi Folks,
I feel I have a decent understanding of single phase/single unit install. However I've got a few queries on paralleling multiplus units.
1. What happens if slave unit goes down/turned off. Does master continue to operate as normal you just have less output capacity.
2. Can you have both units connected on ACIN but only one on ACOUT? ie you have lots of loads grid side but very few on ACOUT1. Similarly vice versa can you have just one unit connected to the grid but 2 units in parallel on ACOUT1 side?
3. Limits within ESS settings and DVCC on GX device are those per unit or overall. ie Limit inverter power and Limit charge current. Are these per multiplus or are they in total?