I'm familiar with configuring already established parallel 120V Quattros in split phase remotely via VRM/VE.Bus system configurator/VEConfig.
One of the two inverters is being replaced.
The question I have is if a replacement Quattro is installed, will I be able to configure the two to operate in split phase remotely via VRM?
When VRM is used to remotely VEconfig a single inverter, it will only download a VEconfig file. When remotely configuring inverters in parallel, it will only download a VE.Bus System Configurator file.
I'm uncertain how a Cerbo connected to an inverter it already "knows" and with a replacement inverter will behave.