We have a very unstable grid supply and around 3kw of solar. We generally run around 2kwh so I want to prioritise solar as the main source and then grid so as not to deplete my batteries when grid is actually available. We are not allowed to feed back to the grid so not sure ESS is the best option seeing as I already make use of the virtual switch for load shedding. Would I be able to configure something with Node RED to achieve this.
We run a 5Kva Multiplus II with a Cerbo and MPPT 150/100