WhatsApp Unknown 2023-08-25 at 11.15.33.zipPlease help. site has 2 by Multiplus 2 in parallel with 3 Smart Solar - 150/100, 150/85 and 150/35. Connected using a grid meter on single phase. When battery and PV is sufficient for loads it feeds power to grid even though it is disabled in ESS. Please see pics and video attached. Please help as client has to pay for any feeding back to grid