Hi,
I would like to confirm a setup.
I have an EM24 (Ethernet) wired as three phase; i.e. I see all three phases.
I have two Multiplus II 5kVA inverters in parallel (single phase) fed from L2. This is an ESS setup.
There appears to be no way to configure the inverters to tell them that they are fed from L2.
It appears that the system is trying to balance the total of all three phases; which isn't possible as it can only feed back into L2.
I have a suspicion that I will need to rewire the EM24 to only measure L2 for the system to function correctly.
Is this correct?