Hi.
I have two mppt 100/30 and a smart shunt that are networked via Bluetooth. They charge four 110ah flooded batteries connected 2s2p. I also have an MPP Solar all in one unit that is also charging the batteries but, obviously isn't talking to the others.
In Summer the system can produce more power than I can safely put into my batteries so the charge rate is limited to 40amp maximum between the three chargers. I could add more batteries, but then the bank would never get fully charged in Winter.
I currently have one of the mppt100/30s set to switch on a water heater or pump when battery voltage gets towards fully charged level.
My question is, is there any way to have the smart shunt tell the two 100/30s increase their output amperage when there is less than 40amp going into the battery bank?