Hi,
I am presently applying to SP networks for a G99 as I am intending to add a Seplos 14kWh battery and Victron Multiplus 2 48/5000 inverter to my existing Solaredge 3.6kW PV array. I intend to do the instal myself and get an electrician to connect the ac side. Although a while ago now, i have a background in electrical and electronic engineering so hope to install most myself.
I intend using ESS mode and limit the export from the Victron to zero but assume the DNO looks at the total possible power export of 8kW) from both inverters (3.6+4.4).
I sent a A1-1 form and single line diagram to SP but received a reply indicating they wanted “a schematic drawing showing the protection systems associated with the automatic disconnecting devices for additional sources of electrical energy including loss of mains protection and trip circuit supervision. G99 protection to be showing at the inverter.”
I have attached the new drawing I am intending to send and would be grateful for any input from those more experienced in this than me.
Also what proof would I need to send them of the Victron’s export being limited to zero or would they want to inspect it?
The are also asking for a location drawing showing boundary lines, xy co-ordinates and substation connection point which I will tackle on return from holiday. I did contact SP for a map request but have not heard back from them yet.
Thanks for your time,