Hello all
For a client with grid 3x230V (no Neutral) we are using a setup with an EM24.
In the remote console the meter is configured as 3P (not 3P.n and not 3P.1)
The Multi-II 5KVA is connected on L1 and L2.
I would think that the EM24 data is correct and the PV charger are correct and the AC loads are miscalculated.
Anybody knows why?
