Looking for guidance on how to prioritize DC / Solar / Battery in a mobile application.
I am looking to minimize costs when plugged into shore power. I would like to use my PV array to run the majority of my loads down to a voltage set point or SOC and once that threshold is crossed have the backup AC power kick in to run loads and if need be recharge batteries.
My system is a Multiplus 24/3000, Midnite solar 150 Charge Controller, 5.5KwH Tesla Module 1600 Watts of PV on the roof, and assorted other parts.
I looked into assistants and ESS but those look to be more of a stationary grid tie application, maybe I am wrong ? I am new to Victron equipment but not new to solar and the related gear.
Can anyone steer me in the right direction ? Thanks !