Hello,
i have a "problem" with my installation, i have 25kWp PV production with my bluesolar mppt but 15kWp inverter (3x5kW Multiplus II), i'm allowed to export to grid without limits.
the result is at 12:00 in summer time my battery is fully charged but my solar production is capped to the power output of my inverters (15kWp instead of 25kWp)
so, i would like to allow the inverters to feed grid even if my battery is not fully charged, is this possible with 'simple' ESS or do i need to go through external control and use some magic MQTT or DBUS commands ?