My off grid system is: victron MultiplusII 10kW, 250/100 MTTP, Cerbo GX, 518AH/24.86KW battery bank, and 5.16KW solar panel system. The battery has a charging/Discharge limit of 100Amps, the MTTP also has a charging limit of 100Amps. Cernario: fully charged batteries, maximum power solar panel. Question: if the AC load needs 200 Amps from the DC part, does the system supply 100Amps from the solar plus 100Amps from the battery or the limit is really 100Amps.