We have a weak 3 phase diesel genset what suffers from asymmetric 3 phase loads. According the 1:1 rule, there are 3 MP2 in star connection with sufficient power to complement missing loads with battery charge currents. Assume, the setup requires any electricity meter (our dealer has ABB on stock) with RS485 at generator output, how can I setup the MP2 to balance the phases over the batteries DC busbar ?