Dear all
I still have to activate my ESS (and install my panels) but I have a "beginners" questions.
While setting up my MP2 (5000), one of the options (i need) is UPS as we have regular grid failure.
My question, when setting up ESS, will the MPPT supply power to the loads when the grid is active (SOC 100%) - and when the grid is out, it will revert the power to loads and battery? Or do I need Node-Red to do the priority settings?