The goal is to design a system that can run for 24 hours a day for 10 days while being able to continuously operate at 120A for the 12V bank and 66A for the 24V bank. The plan is to split the 12V and the 24V banks into two (Primrary and secondary) and alternate between charging one side and using the other.
This is where I am at with the preliminary design.
- Battery Bank 1 (12V):
- Capacity: 440Ah
- Full Load Amps: 370A
- Running Amps: 120A
- Depth of Discharge (DOD): 50%
- Charging Sources:
- 12V/125A Alternator
- 12V/70A Charger
- Battery Bank 2 (24V):
- Capacity: 220Ah
- Full Load Amps: 135.5A
- Running Amps: 66A
- Depth of Discharge (DOD): 50%
- Charging Sources:
- 24V/60A Alternator
- 24V/35A Charger
- AC Power System:
- Input: AC 230V
- Generator: 5.5kW
- Inverter/Charger/UPS: 24/5000 Victron Quattro
- Running Wattage: 5227W
Is it possible to just having the charging inputs constantly on? to allow for 24/7 operations or will i need to allow the batteries to discharge and then be recharged?