Hello.
I'm trying to get over Overload alarms and warning I'm getting when my 3 Phase MP2 10kva units get around 8kwh load (see below)
So I've got a script that is running to isolate the mains power during the peak hours of my tariff, and then turn on and charge the batteries off peak (12am to 5:30am). I've got 80kwh batteries and plenty of output power from them available.
Then I've tried changing this script above to the following, but for some reason when the overload warning or alarm starts there is no change to the MP2's switch; or if it does switch, then after it clears it will not check the basic time script; or it will rapidly switch between all switch states in the script.
Can anyone help me - happy to pay to get this fully fixed and resolved.