It is my understanding that AC2 can be utilised for non-essential loads and given that surplus PV output is available, the surplus can feed these non-essential loads when grid supply is present. My question is if there is a limit on the current through AC2? Could I, for example, connect a potential 20A load on AC2, such a water heater in addition to a 15A essential load on AC1?