In the documentation detailing configuring a Fronius Primo using frequency shift there isn't much information about system operation when installed offgrid. It seems to be for ESS.
We have a 48 - 8000 Quattro configured (at present) with 2 charge controller mppt's, 15 KWh storage and a cerbo GX.
We want to add additional panels and a dual mppt ac string inverter like the Fronius Primo or SMA etc.
If the system requires no power from the Fronius or SMA part of the system, will the frequency shifting work normally with no grid connection?