Good morning everybody,
I have an off grid system with Multiplus 48/5000/70-100 and 4x Pylontech US2000B plus solar panels etc
The overload warnings come while I am using an electric log splitter with a motor rated at 2300w. I assume that it is the initial inrush that lasts a few milliseconds, but I don't have anything sensitive enough to measure that: What I am seeing is 1400w on start up and then 600w or so on idle.
The motor of the log splitter drives a hydraulic pump to action the jaws of the machine - the way it is set up is that the motor has to be started with one hand and then the hydraulic pump controlled with the other (in order to prevent one putting a hand in with the logs). This has to be done for each log, so that the motor is started 4 or 5 times per minute. Therefor a lot of overload warnings. (No overload alarm or shut down).
My question is: Is this over stressing or damaging the Multi or shortening its life?
Would it be a good idea to fit some sort of "soft start" device?? If so, what?
Any thoughts would be gratefully received...