Is it ok for a BPP2 and CCGX to coexist ?
BPP2 with VBC battery Controller currently installed on system.
Thinking would like to maintain use of the the VBC to monitor battery as external AC to DC charger is used on the system (3 phase system - single phase generator)
Assuming it will function as a VEnet / VEbus intterface