Hi there community, busy with a design for a 3 phase ESS installation. I was going to use Fronius or SMA here however no stock for awhile to come. Going to need 12kW of PV so either use an ABB Trio 12kW or use MPPTs. Due to the low loads but 3 phase i have gone with 3 x 5kVA Multiplus 2s to create 3phase. Going to have a 14kWh Pylontech battery bank here which ideally would be used for daily consumption and if there is a poor grid supply to then change it to be fully charged for scheduled power outages.
Also want to make sure there is nothing i am missing. I do have a Color Control.
Thanks all.