Hi all
For an installation I want to use 3 Multiplus II to supply 14 kVA more than the limit of my power contract. This will be happening during two hours per day approx. For this I think I will select each multiplus to have a power of 5kVA.
I saw in the manual of the multiplus II gx this configuration that is near to the one I want to install.
I need to fix the Grid power input to a maximum of 36kVA and my loads will have a peak of 50kVA. I know that is possible to change the grid metering with external meter. Each multiplus II 5000 accepts an external current sensor of 100 A. That will be more than the power that I need.
My question is if this installation can limit my power input (Grid) using the limit grid setpoint on a GX device. I want to configure this parameter to 36kVA or a little lower to limit my grid consumption. All this using the external current.
And also if the internal control of Victron is reliable to not surpass this limit?
Thanks for reading and for any advice.